Build one file that reconstructs the shipment

A cargo claim file should show what goods were accepted, where and when custody changed, what was discovered, and how the amount demanded was calculated. Start with the primary documents and distinguish an observation from an inference. A consignee can confirm that a carton was wet when opened. Establishing where water entered the carton requires other evidence.

Assign someone to maintain the chronology and place the source next to each entry. Include loading and unloading records, interchange receipts, electronic scans, shipment instructions, tracking, the bill of lading and proof of delivery. Keep the originals and add corrected or supplemental records separately. If two documents show different times, counts or locations, mark the difference and ask each party which event its record actually describes.

Worked example: Damage appears after a clean delivery

Assume a consignee signs for five crates of machinery. The exterior looks intact at delivery. Two days later, while unpacking one crate, staff discover damage to the machine inside. The seller requests reimbursement and says the machinery may need replacement. The carrier asks for evidence that the damage occurred while it had custody. These facts create questions about when damage happened, whether the machine can be repaired, and which notices apply.

Establish the condition before transit and at discovery

Ask the shipper for packing photos, inspection or test records, and any loading exceptions it recorded. Ask the consignee who received and opened the crate, where it was stored, whether it was moved after delivery, and what condition they observed. Photograph the packaging and damage from multiple angles and keep identifying marks and serial numbers visible where appropriate. Preserve available footage or inspection reports. Record the difference between the date of delivery and the date damage was first observed.

Protect evidence and coordinate an inspection

Preserve the crate, material used to secure the machine and other evidence where safe and practicable. Check with the appropriate claims contacts before repair, disposal, return shipment or salvage. If equipment must be moved or the business needs to take action to limit further damage, document the condition beforehand and record the reason, action and direct costs. Follow applicable safety requirements and the guidance for the actual incident.

Support the amount being claimed

Retain the commercial invoice, quantity and serial records, repair or replacement estimates, and documentation for freight charges or other amounts if relevant. Separate affected units from undamaged units. Check applicable valuation and liability terms before assuming an invoice is the recoverable amount. If the demand includes expedited replacement, inspection, storage or disposal costs, list those amounts separately and identify the source for each.

Keep each notice tied to its purpose and deadline

Review which notices go to the carrier, broker, warehouse, insurer or other party. Record the recipient, date and method, and save proof of delivery. A freight claim filed with a carrier and notice to an insurer may be separate steps. Where 49 CFR § 370.3 applies, compare the written claim to its requirements, including identifying the shipment, asserting liability for loss or damage and requesting a specified or determinable amount. The regulation states that delivery receipt notations and similar documents alone do not satisfy the minimum filing requirements. Verify the time limits and procedure applicable to your shipment.

Give each recipient the facts relevant to its role and retain its response. If the carrier disputes liability, keep its stated reason and the documents it relies on. If the insured has direct cargo protection, review the notice and cooperation terms separately. A dispute about fault or a clean delivery receipt is a reason to gather evidence promptly. Ask the proper claims contact or counsel how to handle any deadline or procedural question.

Use a file index that can be handed to the claims contact

  • Identify the order, shipment, parties and equipment. Include the commodity, quantity and value.
  • Attach agreements, issued insurance forms and relevant endorsements. Tag each document with the entity or operation it covers.
  • Build a timeline for tender, pickup, transfers, delivery and discovery. Attach the source to each entry.
  • Include the written demand, value support, photos, inspection records and any proposed resolution.
  • Track notice recipients, dates, proof of submission and outstanding actions.

Protect customer, shipment and claims records through approved channels. If the documents do not yet establish what happened, describe the question and name the person who can obtain the evidence. When you review another load, reuse the file index and assign the record owner beforehand. This gives dispatch, receiving, finance and the carrier a common record to reference if an exception appears after delivery.

Montridge can help identify which insurance documents and claim contacts are relevant to the operation. Bring a representative shipment file and the policy language or customer requirement you want to review.

Federal reference: 49 CFR § 370.3, filing claims.

What to record when the goods are temperature-sensitive

For temperature-sensitive freight, request the instructions that applied to the actual shipment and the available records from the equipment and product. Identify who set the requested temperature, where temperature was measured, which device produced the record, and whether a reading reflects air, product or another point. Preserve original data and the time zone or clock settings where available. If the shipment stopped at a cross-dock, compare receiving and release records and what the site documented during the hold. Note missing intervals rather than estimating a reading. Ask the relevant claims contact or qualified inspector what the records can establish and what additional evidence is needed.

Separate the customer’s commercial decision to reject a shipment from any finding about the condition of the goods. Keep the rejection reason, supporting inspection records and any instructions about safe handling or disposition. A rejection may produce costs while questions about the cargo remain unresolved. Keep reasonable mitigation and inspection records available for review, confirm who can authorize the next step and document that approval alongside the original claim file.

Separate requested amounts from supported amounts

Build an item-level table showing the goods, alleged condition, quantity affected, basis supplied for the value, and source documents. Identify which expenses have already been incurred, which are estimates, and which amounts depend on inspection or disposition. If there is more than one invoice or sales figure, mark which one applies to the disputed shipment. Ask the claim contact about approval, handling and evidence before agreeing to a repair, sale or disposal.

Keep record requests accessible after the initial report

Assign a person to track requests to the carrier, warehouse, receiver and customer. Record who has the original, when it was requested and what was received. Store photographs with the date, location and person who supplied them. If a record is missing, say so and identify the remaining source rather than letting a summary stand in for the original. Name the person who will deliver the indexed packet and record the exact version sent to each recipient.

Related resources

Insurance guidance is educational. Coverage depends on the policy, facts and applicable agreements. Illustrative images do not depict Montridge clients or actual claims.